KT Services Completed Jobs


Date

Project Name

Project City

Project Description

Contractor

Photos

09/26/2011

Barney Top Power

Panguitch, UT

Installed New Electrical Service

Pacificorp

n/a

09/19/2011

Bingham Substation

South Jordan, UT

Installed ADSS

Pacificorp

n/a

08/30/2011

Yellowtail Substation

Fort Smith, MT

Installed ADSS, Underground Conduit and all associated materials

Pacificorp

n/a

08/16/2011

Westfield Substation

Highland, UT

Installed ADSS, Underground Conduit and all associated materials

Pacificorp

Photo 1

07/27/2011

Inventory/Clean Up

Salt Lake City, UT

Inventory and Clean Up of Communications yard and storage area. Organized and Documented Fiber Optic Material.

Pacificorp

n/a

07/27/2011

Brigham Substation

Brigham City, UT

Installed ADSS, Underground Conduit and all associated materials

Pacificorp

Photo 1

06/19/2011

Terminal Substation

Salt Lake City, UT

Re-installed MC/Magna ADSS and Underground Conduit

Pacificorp

n/a

06/19/2011

Terminal Substation

Salt Lake City, UT

Installed ADSS, Underground Conduit and all associated materials

Pacificorp

Photo 1

06/11/2011

A/C Installation

Logan, UT

Installed A/C Unit

Symbiotics

n/a

06/22/2011

Generator Installation

Logan, UT

Installed Generator

Fisher Construction

n/a

05/18/2011

Huntington Plant

Huntington, UT

Installed ADSS, Underground Conduit and all associated materials

Pacificorp

n/a

04/29/2011

Dumas Substation

Draper, UT

Installed ADSS, Underground Conduit and all associated materials

Pacificorp

n/a

04/21/2011

Symbiotics

Logan, UT

Installation of a dedicated phone line.

Symbiotics

n/a

04/15/2011

Symbiotics

Logan, UT

Installed Cat 5 data system and Patch Panel in equipment room.

Symbiotics

Photo 1

04/08/2011

Gadsby Substation/Plant

Salt Lake City, UT

Re routed Existing ADSS Underground

Pacificorp

Photo 1

03/31/2011

Grow Substation

Salt Lake City, UT

Installed ADSS, Underground Conduit and all associated materials

Pacificorp

n/a

03/19/2011

Red Butte Fiber Ring

Central, UT

Installed ADSS, Underground Conduit and all associated materials

Pacificorp

Photo 1 Photo 2

02/15/2011

Vickers Substation

Nephi, UT

Installed ADSS, Underground Conduit and all associated materials

Pacificorp

n/a

12/20/2010

Oracle Splice

South Jordan, UT

Spliced ADSS and OPGW at Structure #12 and outside Topaz Metering Yard

Pacificorp

n/a

12/20/2010

Oracle Splice

South Jordan, UT

Installed ADSS

Pacificorp

n/a

11/16/2010

ADSS Reel Test (Oracle Substation)

SLC, UT

Preformed acceptance test for 48 Fiber

Pacificorp

n/a

10/21/2010

5/58-6/68 Line Crossing

Honeyville, UT

Excavated and Installed 270' of 4" PVC

PTTP

n/a

09/13/2010

OPGW Test

Ogden, UT

Tested and Documented 48 Fiber Cable

PTTP

n/a

09/10/2010

Pinto Substation

Monticello, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct, Fiber and Racks, Spliced and Tested 48 Jumpers on 6 Separate Fiber Cables in Splice Trays

Pacificorp

Photo 1

08/26/2010

Ben Lomand Substation Move Fiber

Ben Lomand, UT

Moved Fiber to another Pole and Installed new conduit, innerduct and Fiber

PTTP

Photo 1

08/16/2010

Bear River Line Crossing

Bear River, UT

Installed 4" PVC

PTTP

n/a

08/03/2010

Honeyville Exit

Honeyville, UT

Installed New Electrical Service Installed New Installed 450 feet of 6" PVC

PTTP

n/a

07/29/2010

Red Butte Substation

Central, UT

Installed 4" Conduit and J-Box for entry to control house

Pacificorp

n/a

07/20/2010

Saratoga Tap

Saratoga, UT

Installed and Spliced Fiber

Pacificorp

Photo 1

07/17/2010

Saratoga Substation

Saratoga, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Pacificorp

n/a

06/16/2010

FAA Ballards

Woods Cross, UT

Installed 4 Ballards to Protect Meter Bases

PTTP

n/a

06/11/2010

Honeyville X-Over

Honeyville, UT

Bored and Installed HDPE, PVC, Innerduct, and Fiber

PTTP

Photo 1

06/04/2010

Community Park Rawhide

Casper, WY

Installed Fiber from Str. 2/7 to Str. 3/7 and ran into the communication space

Pacificorp

n/a

06/03/2010

Community Park Elk Horn

Casper, WY

Installed Fiber from Str. 17/10, 18/10, 19/10, 10/18 to 9/18 and ran to communications space

Pacificorp

n/a

06/02/2010

Community Park Substation

Casper, WY

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber from structure to control house

Pacificorp

n/a

04/28/2010

Jim Bridger Substation

Rock Springs, WY

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber from Qwest handhole to Control Building inside

Pacificorp

Photo 1

04/20/2010

Honeville Line Crossing

Honeyville, UT

Directional Bore of 1000' with 6" HDPE and 2- Fiberglass elbows

PTTP

n/a

04/19/2010

North Utah X-Over

Malad, ID

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

PTTP

Photo 1

04/16/2010

N.E. Substation

Salt Lake City, UT

Installed Innerduct, Fiber, Copper Cables and Jumpers

Pacificorp

n/a

04/10/2010

Wheelon X-Over

Tremonton, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

PTTP

n/a

03/31/2010

Parowan

Parowan, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Pacificorp

n/a

05/19/2010

Ben Lomand Substation

Ben Lomand, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

PTTP

n/a

03/30/2010

3 Peaks

Cedar City, UT

Installed 6 Fiber Optic Cables in Innerduct from capacitor bank to control room. Spliced and tested all fibers and installed in splice enclosure and ran 9 jumpers to both protection A and B Cabinets

Pacificorp

Photo 1 Photo 2

03/19/2010

Woods Cross FAA

Woods Cross, UT

Installed PVC Conduit, Ridgid Conduit, Pedistal Meter Bases and Load Side wiring to control boxes for FAA Lighting

PTTP

n/a

03/19/2010

McClelland/Morton Court Substation

Salt Lake City, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber and pull old Morton Court fiber out and re-install as new NE sub route.

Pacificorp

n/a

03/19/2010

Oquirrh Substation

South Jordan, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Pacificorp

n/a

03/17/2010

Topaz Substation

West Jordan, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber as well as Multimode Fiber copper cable equip. Racks and Slack Bracket

Pacificorp

n/a

03/12/2010

West Haven

Ogden, UT

Installed PVC Conduit, 7X12 Vault$42,200.00

PTTP

n/a

03/11/2010

Nebo Substation

Mona, UT

Installed PVC, Riser, Slack Bracket, Slack Vault, Innerduct and Fiber

Pacificorp

Photo 1

02/16/2010

Parrish Substation, Syracuse Substation, Terminal Substation

 

Returned to sites to install post and ground markers

PTTP

n/a

02/12/2010

Layton

Layton, UT

Installed 3 " PVC and Vault

PTTP

n/a

02/04/2010

Plain City

Plain City, UT

Installed 6" PVC and Fiberglass Elbows

PTTP

n/a

01/12/2010

Honeville Substation

Honeyville, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

PTTP

n/a

12/29/2009

Bridgerland Substation

Beaver Dam, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

PTTP

Photo 1

12/12/2009

McClelland Substation

Salt Lake City, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Pacificorp

n/a

12/04/2009

Terminal Substation

Salt Lake City, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

PTTP

n/a

11/25/2009

Syracuse Substation

Syracuse, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

PTTP

Photo 1

11/17/2009

Parrish Substation

Centerville, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

PTTP

Photo 1

11/11/2009

Morton Court Substation

Salt Lake City, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Pacificorp

n/a

09/02/2009

McClelland Substation

Salt Lake City, UT

Install Innerduct

Pacificorp

n/a

09/02/2009

 

South Jordan, UT

Relocated Fiber Optic Line

Pacificorp

n/a

08/07/2009

Parowan Substation

Parowan, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Pacificorp

n/a

07/08/2009

5th West Substation

Salt Lake City, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Pacificorp

n/a

06/17/2009

Goldrush Substation

Bear River City, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Pacificorp

n/a

06/11/2009

Decade Substation

Salt Lake City, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Pacificorp

n/a

06/08/2009

Sorrel River Ranch

Moab, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Sorrel River Ranch

Photo 1 Photo 2

03/19/2009

Cedar Service Center

Cedar City, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Pacificorp

n/a

03/14/2009

Coleman Substation

Cedar City, UT

Provided Labor and Equipment to install Conduit, Vaults, Innerduct and Fiber

Pacificorp

n/a

03/09/2009

West Cedar Substation

West Cedar, UT

Provided Labor & Equipment to install Conduit, Vaults, Innerduct and ADSS Fiber

Pacificorp

Photo 1 Photo 2 Photo 3 Photo 4 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9 Photo 10

01/19/2009

Craner Flats, Horseshoe & Rowley Substations

Rowley, UT

Horseshoe & Rowley Subs required new A/C Units to be Installed and Wired. ADSS fiber is required at Craner Flat Substation and at Rowley Substation

Pacificorp

n/a